Netgear M4300-24X24F (XSM4348S) - Stackable Managed Switch with 48x10G including 24x10GBASE-T and 24xSFP+ Layer 3 Manual Do Equipamento

Página de 49
Maintenance and Troubleshooting 
47
 Managed Stackable Switch Series M4300
Replace a Power Supply Unit
You can replace a power supply unit (PSU). If your switch includes a second power module 
bay in which a PSU is installed, you can replace the PSU while the switch remains powered 
on and functioning.
The figures in the following procedure show model M4300-24X24F and M4300-24X. 
However, you replace a PSU in model M4300-28G, M4300-28G-POE+, M4300-52G, 
M4300-52G-POE+, M4300-8X8F, or M4300-48X in the same manner.
To remove one PSU and reinstall another PSU in the same power module bay:
1. 
If your switch functions with a single PSU only, disconnect the power cord from the PSU 
and let the switch power down.
If your switch functions with two PSUs, you do no need to power down the switch and can 
perform a hot swap.
2. 
Remove the PSU from the power module bay by moving the release latch to the left and 
pulling the extraction handle.
3. 
Insert the other PSU into the power module bay, and gently push the PSU into the bay until 
the latch locks.
WARNING:
When inserting the PSU, do not use unnecessary force. Doing so can 
damage the connectors on the rear of the PSU and on the midplane.
OR