KitchenAid 42'' Island-Mount 600 CFM Canopy Hood, Architect® Series II Utilização E Cuidado

Página de 32
3
INSTALLATION REQUIREMENTS
Tools and Parts
Gather the required tools and parts before starting installation. 
Read and follow the instructions provided with any tools listed 
here.
Tools Needed
Level
Drill with 1¼" (3.0 cm), 
³⁄₈" (9.5 mm), ⁷⁄₆₄" (2.75 mm) and ¹⁄₈" 
(3.0 mm) drill bits
Pilot hole drill bits (determined by chimney support 
attachment method)
Pencil
Wire stripper or utility knife
Tape measure or ruler
Pliers
Caulking gun and weatherproof caulking compound
Vent clamps
Jigsaw or keyhole saw
Flat-blade screwdriver
Metal snips
Phillips screwdriver
Parts Needed
Home power supply cable
½" (12.7 mm) UL listed or CSA approved strain reliefs (2)
UL listed wire connectors (3)
For Vented Installations, You Will Also Need: 
Wall or roof cap (1)
Metal vent system
IMPORTANT SAFETY INSTRUCTIONS
READ AND SAVE THESE INSTRUCTIONS