Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação

Página de 317
  RMA Shipping Procedures 
Packaging ASR 5000 Cards  ▀   
 
ASR 5000 Installation Guide  ▄  
 
   
309 
Packaging an Application Card 
The packaging sequence is as follows: 
Step 1 
Place the card inside the ESD bag; fold over and seal the bag with an ESD Label or tape as shown in the photos. 
 
   
 
Step 2 
If packing an SMC, a foam block must be removed from the bottom foam near the connector cut outs.