Cisco Cisco UCS B440 M1 High-Performance Blade Server Guia De Informação

Página de 3
 
 
Product End-of-Life Notice
 
© 2015 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. 
Page 1 of 3 
End-of-Sale and End-of-Life Announcement for the 
Cisco UCS N20-6508 5108 UCS Blade Server AC 
Power Supply 
EOL9834
–Amended 
Cisco announces the end-of-sale and end-of life dates for the Cisco UCS N20-6508 
5108 Blade Server AC Power Supply. The last day to order the affected product(s) is 
December 30, 2015. Customers with active service contracts will continue to receive 
support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the 
EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for 
the affected product(s). Table 2 lists the product part numbers affected by this 
announcement. For customers with active and paid service and support contracts, 
support will be available under the terms and conditions of customers' service 
contract. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco UCS N20-6508 5108 Blade Server AC Power Supply 
Milestone 
Definition 
Date 
End-of-Life 
Announcement Date 
The date the document that announces the end of sale and end of life of a product is 
distributed to the general public. 
June 30, 2014 
End-of-Sale Date 
The last date to order the product through Cisco point-of-sale mechanisms. The product is 
no longer for sale after this date. 
December 30, 2015 
Last Ship Date: 
HW 
The last-possible ship date that can be requested of Cisco and/or its contract 
manufacturers. Actual ship date is dependent on lead time. 
March 30, 2016 
End of SW Maintenance 
Releases Date: 
HW 
The last date that Cisco Engineering may release any final software maintenance releases 
or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or 
test the product software. 
December 30, 2018 
End of Routine Failure 
Analysis Date: 
HW 
The last-possible date a routine failure analysis may be performed to determine the cause 
of hardware product failure or defect. 
December 30, 2016 
End of New Service 
Attachment Date: 
HW 
For equipment and software that is not covered by a service-and-support contract, this is 
the last date to order a new service-and-support contract or add the equipment and/or 
software to an existing service-and-support contract. 
December 30, 2016 
End of Service Contract 
Renewal Date: 
HW 
The last date to extend or renew a service contract for the product. 
March 30, 2020 
Last Date of Support: 
HW 
The last date to receive applicable service and support for the product as entitled by active 
service contracts or by warranty terms and conditions. After this date, all support services 
for the product are unavailable, and the product becomes obsolete. 
December 31, 2020 
 
HW = Hardware 
OS SW = Operating System Software 
App. SW = Application Software