Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação

Página de 195
Cable Management System Installation   
▀  CMS Procedure for Replacing ASR 5500 Circuit Cards 
 
 
▄  ASR 5500 Installation Guide 
186 
   
Raising the Cable Management Tray 
Step 1 
Grasp the base and slowly raise the cable management tray upward. 
Step 2 
Verify that the cable tray can be lifted upward and secured without pinching any of the network cables. If necessary 
increase the slack in a bundle to avoid damaging the cables. 
Step 3 
Flip the latches on the swing arms up and over the posts to secure the tray to the chassis.