Cisco Cisco Packet Data Gateway (PDG) Guia Da Instalação
Cable Management System Installation
▀ CMS Procedure for Replacing ASR 5500 Circuit Cards
▄ ASR 5500 Installation Guide
186
Raising the Cable Management Tray
Step 1
Grasp the base and slowly raise the cable management tray upward.
Step 2
Verify that the cable tray can be lifted upward and secured without pinching any of the network cables. If necessary
increase the slack in a bundle to avoid damaging the cables.
increase the slack in a bundle to avoid damaging the cables.
Step 3
Flip the latches on the swing arms up and over the posts to secure the tray to the chassis.