Cisco Cisco Packet Data Gateway (PDG) Guia De Resolução De Problemas

Página de 580
  PDIF Session Recovery 
Session Recovery  ▀   
Cisco ASR 5000 Series Enhanced Feature Configuration Guide  ▄  
 
  OL-22983-01 
Planned PSC Migration 
This is the case when a system administrator decides to migrate an ASR 5000 application card (PSC). When the 
migration command is issued, all the tasks on affected card are notified to get ready for migration. After task migration 
is complete, all the tasks are notified and any post-migration adjustments will be done. At the end of the migration 
process, each IPSec Manager is returned to its previous normal operational state before it started migration. 
 
Unplanned PSC Migration 
This is the case when there is a system fault and a card has failed, or when an individual task fails. When tasks are 
restarted as a result of either card failure or task failure, it is recovered with saved information and put back into its 
previous state of operation. In either planned or unplanned recovery, only tunnels that are in an already established state 
can be recovered. Any non-established tunnels may be lost. 
 
Hardware Requirements and Configuration 
Because session recovery requires numerous hardware resources, such as memory, control processors, NPU processing 
capacity, etc., some additional hardware may be required to ensure that enough resources are available to fully support 
this feature. 
Important:
  PDIF is designed to run on an ASR 5000 chassis using only SMC controller cards and PSC 
application cards. 
Important:
  A minimum of four PSCs (three active and one standby) per individual chassis is required to use this 
feature. 
To allow for complete session recovery in the event of a hardware failure during a PSC migration, a minimum of three 
active and two standby PSCs should be deployed. 
To assist you in your network design and capacity planning, the following list provides information that should be 
considered. 
 
Subscriber capacity is decreased depending on the hardware configuration.A fully configured chassis (12 active 
PSCs and 2 standby PSCs) would experience a smaller decrease in subscriber capacity versus a minimally 
configured chassis (3 active PSCs and 2 standby PSCs). 
 
The amount by which control transaction processing capacity is reduced. 
 
The reduction in subscriber data throughput. 
 
The recovery time for a failed software task (e.g. session manager). 
 
The recovery time for a failed PSC (hardware failure). 
If a PSC migration is being performed, this may temporarily impact the ability to perform session recovery as hardware 
resources (e.g. memory, processors, etc.) that may be needed are not available during this operation.To avoid this 
condition, a minimum of two standby PSCs should be configured.