Cisco Cisco ONS 15216 (EDFA3) Metropolitan Regional DWDM System Guia Da Instalação

Página de 28
Install and Route Fiber-Optic and USB Cables
All connectors are on the front of the ONS 15216-MD-48-CM/15216-MD-48-CME pluggable and are equipped with LC/UPC
bulkhead adapters and with a USB Type A receptacle connector for inventory purpose. For port label description, see "
". The LC-LC patch cords are used to connect the ONS 15216-MD-48-CM/15216-MD-48-CME
pluggable to the patch panels.
Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams
or view directly with optical instruments. Statement 1051
Warning
When connecting an optical fiber patch cord between the patch panel and the optical card ports in a Cisco
ONS 15454, use the electrostatic discharge wristband supplied with the ONS 15454. Plug the wristband
into the ESD jack on the lower right front side of the ONS 15454.
Caution
Always clean all fiber connectors thoroughly before making the connection with the mating adapter. Very
small particles can permanently damage the end of the mating fiber inside the patch panel, which makes
regular cleaning imperative. For cleaning instructions see "
page 19
".
Note
The ONS 15216-MD-48-CM/15216-MD-48-CME pluggables have LC/UPC bulkhead adapters for optical
connections. Always use fiber-optic cables equipped with the corresponding (LC/UPC) connector type.
Using any other type of connector results in damage to the connector or adapter, or both.
Caution
Procedure
Step 1
To connect the fibers as appropriate (see the following figure):
a) Remove the LC adapter cap from the LC-LC adapter of the ONS 15216-MD-48-CM/15216-MD-48-CME pluggable
.
b) Place the LC/UPC cable connector in front of the corresponding bulkhead adapter on the front panel of the ONS
15216-MD-48-CM/15216-MD-48-CME pluggable.
c) Align the keyed ridge of the cable connector with the slot in the receiving adapter.
d) Gently push the cable connector into the adapter until you hear a click, which indicates that the latching system is
engaged.
e) Route the cables through the left or right fiber holder clip.
f) (Optional) Secure the fibers further by placing them into one or more adhesive clips. The adhesive clips can be placed
on the fiber management plate as per the actual installation conditions.
g) Place the extra fiber length of the two LC-LC patch cords used to connect the patch panel with its plugged ONS
15216-MD-48-CM/15216-MD-48-CME module on the interleaver/deinterleaver or coupler/splitter fiber management
bracket.
16