Cisco Phoenix - HFC Network Monitoring Gateway Guia De Informação
Product End-of-Life Notice
© 2011 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public Information.
Page 1 of 4
End-of-Sale and End-of-Life Announcement for the ROSA SI Server
Series Service Information and EPG Management System
Series Service Information and EPG Management System
EOL7549
Cisco announces the end-of-sale and end-of-life dates for the ROSA SI Server Series Service Information
and EPG Management System. The last day to order the affected product(s) is March 8, 2012. Customers
with active service contracts or active warranties will continue to receive support from the Cisco Technical
Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life
milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers
affected by this announcement. For customers with active service contracts or active product warranties,
support will be available for the shown dates as stated in the applicable service contracts or product
warranty terms and conditions, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1.
End-of-Life Milestones and Dates for the ROSA SI Server Series Service Information and EPG Management System
Milestone
Definition
Date
End-of-Life Announcement
Date
Date
The date the document that announces the end of sale and end of life of a product is
distributed to the general public.
distributed to the general public.
September 8, 2011
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The
product is no longer for sale after this date.
product is no longer for sale after this date.
March 8, 2012
Last Ship Date:
HW
HW
The last-possible ship date that can be requested of Cisco and/or its contract
manufacturers. Actual ship date is dependent on lead time.
manufacturers. Actual ship date is dependent on lead time.
June 6, 2012
End of SW Maintenance
Releases Date:
HW
Releases Date:
HW
The last date that Cisco Engineering may release any final software maintenance
releases or bug fixes. After this date, Cisco Engineering will no longer develop,
repair, maintain, or test the product software.
releases or bug fixes. After this date, Cisco Engineering will no longer develop,
repair, maintain, or test the product software.
March 8, 2013
End of Routine Failure
Analysis Date:
HW
Analysis Date:
HW
The last-possible date a routine failure analysis may be performed to determine the
cause of hardware product failure or defect.
cause of hardware product failure or defect.
March 8, 2013
End of New Service
Attachment Date:
HW
Attachment Date:
HW
For equipment and software that is not covered by a service-and-support contract,
this is the last date to order a new service-and-support contract or add the
equipment and/or software to an existing service-and-support contract.
this is the last date to order a new service-and-support contract or add the
equipment and/or software to an existing service-and-support contract.
March 8, 2013
End of Service Contract
Renewal Date:
HW
Renewal Date:
HW
The last date to extend or renew a service contract for the product.
June 3, 2016
Last Date of Support:
HW
HW
The last date to receive applicable service and support for the product as entitled by
active service contracts or by warranty terms and conditions. After this date, all
support services for the product are unavailable, and the product becomes obsolete
**. Warranty duration is based on product ship dates; refer to warranty terms and
conditions for details.
active service contracts or by warranty terms and conditions. After this date, all
support services for the product are unavailable, and the product becomes obsolete
**. Warranty duration is based on product ship dates; refer to warranty terms and
conditions for details.
March 31, 2017
HW = Hardware
OS SW = Operating System Software App. SW = Application Software