Cisco Cisco D9854 Advanced Program Receiver Guia Da Instalação

Página de 418
 
 
 
Connecting the Receiver to Other Equipment 
 
OL-29009-01 
11 
 
5  Apply power by connecting the receiver to a power outlet. The message 
“Application Starting” will appear on the front panel. The boot process 
approximately 1 minute for the unit to initialize. When ready, the front panel 
display shows the startup screen. 
6  The Ethernet Management port supports the following network protocols: 
Telnet, SSHv2, HTTP, HTTPS, SNMPv2, Syslog/DTX, SNTP, FTP (client side), 
TFTP, and MPEGoIP output (D9854 only). 
7  Connect the HD-SDI outputs (M1 and M2) to HD compatible signal processing 
equipment or HD signal monitoring equipment, if applicable. 
 
Maintenance of EMC Compliance 
The power cord (consisting of appliance coupler, flexible cord, and plug) supplied 
with this product meets the requirements for use in the country for which this 
product was purchased. In general, the power cord must be approved by an 
acceptable, accredited agency responsible for evaluation in the country where the 
product will be used.  
Double-shielded (braid/foil or braid/braid) cables should be used for all ASI I/O 
and RF inputs. Single-shield cables are acceptable for all other inputs and outputs. 
For terminal block (Alarms) I/O, no shielding is required.