Cisco Headend System Release 2.5 Guia Da Instalação

Página de 280
78-738190-01 Rev B 
SR 2.5 and SR 3.5 Post Upgrade Procedures 
5-47 
Configure the System for Open Cable Compliance,
 Continued 
 
10.  Type the number associated with the SiManager process and then press 
Enter
Note:  The SiManager process may be listed on the same line as the 
DSM/BSM process. 
Result:  The system prompts you to enter a target status for the selected 
process. 
11.  Type 2 (for running) and then press Enter
Result:  The Dncs Control window displays a confirmation message. 
12.  Type y (for yes) and then press Enter
Result:  The Dncs Control window refreshes. 
Note:  The Dncs Control window will refresh in real time, or you can press 
Enter to force a refresh. 
13.  Wait until Curr Stt (for current state) indicates running
14.  Follow the on-screen instructions to return to the Main Menu and to exit the 
DNCS Control window.