Cisco Headend System Release 2.5 Guia Da Instalação

Página de 280
78-738190-01 Rev B 
SR 2.5 and SR 3.5 UniPack Pre-Upgrade Procedures 
1-13 
Verify System Communications,
 Continued 
 
4. 
 
Verify that you can manually ping the following hardware components: 
• 
The Asynchronous Transfer Mode (ATM) switch (if one exists) 
• 
All router interfaces in the system 
5. 
 
Type df  -k and then press Enter to verify that you are using no more than 85 
percent of the partition capacity of each disk. 
Note:  If any disk partition lists a capacity of greater than 85 percent, contact 
Cisco Services before proceeding. 
6. 
 
Complete these steps to perform a slow and fast boot on a test DHCT with a 
working return path (2-way mode): 
a)  Boot a DHCT. 
Note:  Do not press the power button. 
b)  Access the Power On Self Test and Boot Status Diagnostic Screen on the 
DHCT and verify that all parameters, except UNcfg, display Ready.   
Note:  UNcfg displays Broadcast
c)  Wait 5 minutes. 
d)  Press the power button on the DHCT. 
Result:  The power to the DHCT is turned on. 
e)  Access the Power On Self Test and Boot Status Diagnostic Screen on the 
DHCT and verify that all parameters, including UNcfg, display Ready.  
7. 
 
Verify that you can ping the DHCT. 
8. 
 
Verify that the Interactive Program Guide (IPG) displays 7 days of accurate 
and valid data. 
9. 
 
Tune to each available channel on a DHCT to confirm that a full channel 
lineup is present. 
Note:  Record any anomalies you notice while verifying the channel lineup. 
10. 
 
Choose one of the following options: 
• 
For sites with the Pioneer application, verify that you can purchase an 
existing impulse pay-per-view (IPPV) event. 
• 
For sites with the Cisco application, verify that you can define, purchase, 
and view an IPPV event. 
11. 
 
Go to Check the EAS Configuration, next in this chapter.