Cisco Headend System Release 2.5 Manual De Manutenção
Chapter 3 Staging SSC DHCTs
80
4024836 Rev D
14 Disconnect the DHCTs and either return them as staged inventory to your
warehouse or give them to technicians to install at the subscribers' locations.
Note: Some sites reverse steps 13 and 14 to let the installers see services during the
installation before having the DHCT receive a hit with the subscriber's contracted
services. If your site does this, the DHCT will only display services if the DHCT is
installed within the EMM timeout period (by default, 30 days). After the timeout
period, the DHCT will need to receive a hit before it can display any secure services.