Cisco DNCS System Release 2.7 3.7 4.2 Referências técnicas

Página de 8
  
 
 
 
 
 
 
 
Operations Alert Bulletin 
Obtaining and Installing the SAI Tools 
Patch 
Background 
Beginning in the spring of 2007, U.S. Daylight Saving Time (DST) starts the second 
Sunday in March (March 11, 2007) and ends the first Sunday in November 
(November 4, 2007) in response to the decision by the U.S. Congress to extend DST 
by 4 weeks. 
Sun Microsystems, Inc. has notified its customers of a new patch that they are 
providing that is required to implement DST. For Cisco, this patch affects the Rogue 
Wave libraries that are heavily used by the DNCS. This patch is not included in any 
other DST patch you may have received and installed, to date. 
Cisco has determined that systems that run SR 2.7/3.7/4.2 software need to install 
the SAI Tools patch in order to prepare the Rogue Wave libraries of the DNCS for 
DST implementation. If system operators fail to install the SAI Tools patch, split 
channel schedules will not be accurate. The saManager file is the only executable file 
on the DNCS affected by this patch. 
Cisco has made the SAI Tools patch available on the Cisco FTP server, as well as 
through CD. See Installing the SAI Tools Patch for instructions on installing the SAI 
Tools patch from CD.