Cisco Cisco Prisma II EDR Receiver Guia Da Instalação
78-715189-01 Rev C
Installation
2-3
Site Requirements
Overview
Before you begin, make certain that your installation site meets the requirements
discussed in this section.
Access Requirements
Ensure that only authorized personnel have access to this equipment. Otherwise,
personal injury or equipment damage may occur.
WARNING:
Use this product in locations that restrict access to all persons who are not
authorized. Otherwise, personal injury or equipment damage may occur.
Equipment Rack
To install the modules, your site should be equipped with an Electronics Industry
Association (EIA) equipment rack that will properly house the Prisma II chassis with
proper spacing for air circulation. For instructions on installing the chassis in the
rack, refer to the guide that was shipped with the chassis.
Operating Environment
CAUTION:
Avoid damage to this product! Operating this product above the maximum
operating temperature specified voids the warranty.
Follow these recommendations to maintain an acceptable operating temperature.
•
Chassis air inlet temperature must be between -40°C and 65°C (-40°F and 149 °F)
•
Keep cooling vents clear and free of obstructions.
•
Provide ventilation, as needed, using one or more of the following methods.
- air-deflecting baffles
- forced-air ventilation
- air outlets above enclosures
- forced-air ventilation
- air outlets above enclosures