ADC H2TU-C-388 Manual Do Utilizador

Página de 66
152-388-100-02, Issue 2
 
Testing
H2TU-C-388 List 1
June 6, 2000
 43
4
Press SEL to activate the selected loopback. The previous loopback is terminated.
Once a loopback is selected and activated, the loopback stays active until it times out (based on the LBTO setting). 
When a loopback times out, the display then returns to the normal display mode.
You can terminate loopbacks manually and exit the 
MAN LPBK
 mode by simultaneously pressing the MODE and 
SEL buttons for 3 or more seconds. If no loopback is active, the 
MAN LPBK
 mode automatically terminates after 
30 seconds.
All loopbacks (except dual loopbacks) can be initiated by inband commands in the DS1 payload. Loopbacks can 
also be initiated by a command from the HiGain system (front-panel buttons or maintenance screen selections). 
Therefore, whenever a loopback is active, the method by which it was activated is indicated in the Loopback and 
Status screens by the annotation HG or PL adjacent to the identified loopback. For example, NREM-HG indicates 
that the loopback was initiated by the HiGain system.
L
OOPBACK
 T
EST
 P
ROCEDURES
The following sections provide step-by-step test procedures for verifying the integrity of the HDSL2 channels at 
every module location as well as the DS1 channels to the customer and the local DSX-1 interface. 
General Troubleshooting Tips
If trouble is encountered on the DSX-1 interface of the H2TU-C-388, verify that the:
H2TU-C is making a positive connection with its mounting-assembly (shelf) connector. 
H2TU-C internal equalizer is set to the correct distance range per 
. All equalizers should 
be set to the distance from the DSX-1 to the shelf.
The transmit and receive DSX-1 ports have splitting access jacks and miniature, 210-series, monitor jacks as 
shown in 
. Connecting one cable between the two monitoring jacks and another between the 
two LINE jacks splits the IN and OUT and creates metallic loopbacks towards both the DSX-1 and the 
H2TU-C-388. If separate plugs are inserted into both LINE jacks with the other end disconnected, the MON jacks 
can be used to send and receive test patterns towards the DSX-1.
GNLB Test Procedures
 is a graphical representation of the various loopback configurations with the associated 
GNLB commands shown. Also, refer to 
 for a description of these commands.
To perform the GNLB loopback test procedure:
1
Have the CO tester send the NREM (3-in-7) inband loopup code for 5 seconds. You should be able to observe 
the NREM message on the front-panel display. (The Status LED on the front panel should be green, and the 
loopback mode should also be identified on the Span Status screen.)
2
Have the CO tester transmit a DS1 test signal towards the H2TU-C-388 and verify that the returned (looped) 
signal to the test set is error-free. 
3
If step 2 fails, have the CO tester transmit the 3-in-5 inband loopdown code.
SMJK loopback commands are only activated by inband commands. Dual loopback commands 
are only activated by the front-panel buttons or maintenance screen selections.