Polycom spectralink jpi300 Manual Do Utilizador

Página de 68
 
PN: 1725-36122-001_M.doc 
49
Install Base Stations 
Be sure the Base Station is positioned clear of anything that might 
damage it. The Base Station should be well above head height, away 
from doors and other objects that might strike it, and away from areas 
open to the elements or possible water leaks. 
Check the location for other radio antenna devices and place the Base 
Stations to avoid interference. Leave enough slack wire to account for 
possible future Base Station moves. 
Mount Base Stations on Dropped Tile Ceilings 
A ceiling clip and plastic bolt are supplied to install Base Stations on 
the drop ceiling rails (T-bars) used to support acoustical tile. The 
plastic bolt screws into the top of the Base Station, then snaps into the 
ceiling clip which has been attached to the rails that hold the 
acoustical tile. The fastener is designed for use on 15/16" wide rails. 
1.  Attach the metal fastener to the rail (T-bar) supporting the 
dropped ceiling by rotating it into position until it snaps into the 
locked position. 
2.  Screw the plastic bolt to the 1/4” x 20 captive nut into the top of 
the Base Station.  
3.  Slide the bolt into the exposed prongs of the metal clip until it 
snaps into position.  
 
6