Interphase Tech ispan 5535 pri Manual Do Utilizador

Página de 168
Displaying and Saving Events
92
Interphase Corporation
N
OTE
If you want to test more than two B channels or more than 
one port simultaneously, launch several instances of the 
utility and repeat steps 2 to 4 f
or each channel or port. 
(You can change the number of frames sent if you want a 
longer test—see Setting the Number of Frames to Send
 on 
page 93
).
5. To re-enable the RAS Server:
a. From the Start menu, select Programs, then 
Administrative Tools (Common), and then 
Remote Access Admin. 
b. From the Server menu, select Start Remote Access 
Service.
c. If Windows NT does not display the name 
automatically, enter the server name preceded by 
two backslashes (\\). To determine the server name, 
see 
Index of Common Tasks
 on page 115.
d. Click OK.
Displaying and Saving Events
The event list is an additional window at the bottom of the 
LoopTest main dialog that displays communication events, 
such as communication established between the two B 
channels, and data being sent on one B channel. 
To show or hide the LoopTest event list: