Vector iveco motos v08 ent m12 Manual Do Utilizador

Página de 60
INSTALLATION DIRECTIVE
MAY 2006
V08 EnT M75 - M11 - M12
14. PREPARING THE ENGINE FOR FIRST 
START-UP
15. TESTS BEFORE THE FIRST START-UP
1.  Drain the residual 30/M protective oil from the sump.
2.  Pour into the lubricating loop only lubricating oil of the 
type and in the quantities set out in the Refilling Table.
3.  Drain  the  CFB  protective  liquid  from  the  fuel  loop, 
completing the operations as indicated under item 3. of 
Chapter 19. 
4.  Remove  the  caps  and/or  seals  from  the  engine  intake, 
exhaust,  aeration  and  venting  ports,  restoring  normal 
conditions of use. Connect the inlet of the turbocharger 
to the air filter.
5.  Connect  the  fuel  loops  to  the  boat  tank,  completing 
the operations set out in item 4. of Chapter 19. During 
filling operations, connect the pipe returning fuel to the 
tank to a collecting container, to prevent residues of CFB 
protective liquid from ending up into the boat tank.
6.  Verify and refill engine coolant as prescribed.
7.  Remove from the engine the labels with the inscription 
“EnGInE WITHOUT OIL”.
Although  they  are  extremely  important, “common  sense” 
checks such as the exposure of sensitive parts (plastics, wire 
harness, electronic units, etc. ...) to heat, and those that for 
years have characterized the quality of the work performed 
in the yard, are not mentioned herein.
Tests of the proper operation of the engine and the com-
ponents of the electronic control system may be performed 
rapidly and with the utmost reliability using specific diagnostic 
tools,  available  from  IVECO  MOTORS Technical Assistance 
Centres.
Fuel tank suction
Verify the fuel suction at the maximum allowed longitudinal 
and transverse inclination, with the residual quantity of fuel 
considered “RESERVE”, such as to cause the reserve indica-
tor light to be permanently lighted.
Throttle lever position sensor
In the positions of minimum and maximum travel, verify the 
correlation  between  the  position  of  the  throttle  control 
valve on the bridge and the position of the sensor rod.
Instruments and control panel
Verify the efficiency of all light indicators, as described in the 
related Chapters.