1.  Connect the voltage test leads L2 or B and N to the common ground 
point. 
2.  In PQ Log, select the measuring range with P-P logging and matching 
nominal voltage. 
3.  Enter the correct converter/transformer ratio for current and voltage. 
 
egb007.bmp 
Figure 11. PQ Log Settings for a 16 kV Network 
Note 
Current clamp sets are available for 1 A current transformer. 
Logging 
When the Logger is connected and ready, you can perform three types of 
logging: 
  Switch-activated job: The status LED is blinking. Press the 
START/STOP button once. As soon as the job is active, the LED is 
on continuously. If needed, the job can be cancelled after running for 
at least one minute, and restarted later.