efd pm6500 Guia De Configuração Rápida

Página de 4
Easy 7-Step Setup
Follow these steps to get your ProcessMate
Temperature Control System ready for operation.
®
A NORDSON COMPANY
ProcessMate
6500
Temperature Control System
• Connect the power plug to the power pack. The unit
is shipped with a USA-compatible plug and three
international plugs. Attach the correct plug to match
local power outlets.
• Connect the power cord into the back of the
ProcessMate.
• Connect the power cord into your local power source.
Quick Start Guide 
• Use the checklist enclosed with the ProcessMate to identify all items.
If there is any discrepancy, please call us immediately.
• Now is a good time to activate your extended One Year No-Fault Warranty.
Register the warranty online at www.efd-inc.com/warranty/one
Unpack the Unit/Warranty 
1
Connect Power
2
1