Cisco Catalyst C3560G-48PS-S Guia De Especificação

Página de 5
 
 
Product End-of-Life Notice
 
© 2012 Cisco and/or its affiliates. All rights reserved. This document is Cisco Public. 
Page 1 of 5 
End-of-Sale and End-of-Life Announcement for the 
Cisco Catalyst 3750G, 3560G, 3750-E, and 3560-E 
Series Switches 
EOL8044 
Cisco announces the end-of-sale and end-of life dates for the Cisco Catalyst 3750G, 
3560G, 3750-E, and 3560-E Series Switches. The last day to order the affected 
product(s) is January 30, 2013. Customers with active service contracts will continue 
to receive support from the Cisco Technical Assistance Center (TAC) as shown in 
Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, 
and dates for the affected product(s). Table 2 lists the product part numbers affected 
by this announcement. For customers with active and paid service and support 
contracts, support will be available until the termination date of the contract, even if 
this date exceeds the Last Date of Support shown in Table 1. 
Please note that the list price of some of the products listed in this announcement may increase in the next 
12 months. 
Table 1. 
End-of-Life Milestones and Dates for the Cisco Catalyst 3750G, 3560G, 3750-E, and 3560-E Series Switches 
Milestone 
Definition 
Date 
End-of-Life Announcement 
Date 
The date the document that announces the end of sale and end of life of a product is 
distributed to the general public. 
January 31, 2012 
End-of-Sale Date  
The last date to order the product through Cisco point-of-sale mechanisms. The product is no 
longer for sale after this date. 
January 30, 2013 
Last Ship Date: 
HW 
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. 
Actual ship date is dependent on lead time. 
April 30, 2013 
End of SW Maintenance 
Releases Date:  
HW 
The last date that Cisco Engineering may release any final software maintenance releases or 
bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test 
the product software. 
January 30, 2014 
End of 
Vulnerability/Security 
Support: 
OS SW 
The last date that Cisco Engineering may release a planned maintenance release or 
scheduled software remedy for a security vulnerability issue. 
January 30, 2016 
End of Routine Failure 
Analysis Date: 
HW 
The last-possible date a routine failure analysis may be performed to determine the cause of 
hardware product failure or defect. 
January 30, 2014 
End of New Service 
Attachment Date: 
HW 
For equipment and software that is not covered by a service-and-support contract, this is the 
last date to order a new service-and-support contract or add the equipment and/or software 
to an existing service-and-support contract. 
January 30, 2014 
End of Service Contract 
Renewal Date: 
HW 
The last date to extend or renew a service contract for the product.  
April 30, 2017 
Last Date of Support: 
HW 
The last date to receive service and support for the product. After this date, all support 
services for the product are unavailable, and the product becomes obsolete. 
January 31, 2018 
 
HW = Hardware 
OS SW = Operating System Software  App. SW = Application Software