Consert Inc. CMGYZCDCZ31 Manual Do Utilizador

Página de 14
 
About This Guide 
Installing a Gateway Into a GE Meter 
 
 
A
BOUT 
T
HIS 
G
UIDE
 
P
URPOSE
 
This assembly guide provides detailed instructions for installing a Consert gateway into a General Electric 
(GE) I-210+ electric meter. 
T
ARGET 
A
UDIENCE
 
Assembly technicians tasked with assembling the gateway-meter combination. 
P
REREQUISITES
 
The following is required for installation of a Consert gateway into a GE electric meter: 
■ 
Assembly Technicians must have completed a static electricity prevention course 
■ 
All work must be performed in a static-controlled environment 
W
HAT
N
EW IN 
T
HIS 
E
DITION
 
This edition of the guide contains the following changes: 
■ 
All information related to R915 modules has been removed. 
■ 
A verification step has been added to the assembly procedure to ensure that required FCC ID infor-
mation is provided on the Consert label that assemblers attach to the meter. 
■ 
The  Consert  address  and  Customer  Support  phone  number  have  changed  to  reflect  the  company’s 
new location in San Antonio, Texas.