Avitec AB CSFT1922 Manual Do Utilizador

Página de 112
  
COMMAND AND ATTRIBUTE SUMMARY
 
 
© Avitec AB 
6/15/2004 
84 (96)  
Note 1!
 This command will return the command prompt directly, and the actual measurement will be 
performed in the background. In order to get the last measurement, poll the GET LAI until time stamp in 
the reply shows that the measurement is completed. 
Note 2!
 Since Fiber Optic repeaters and repeaters CSFT18922 and CSFT91822 cannot oscillate, 
measuring antenna isolation will not give a meaningful result. For that reason, automatic antenna 
isolation is not by default enabled in these repeaters. 
5.3 
ACT CLO 
Clears all entries in the alarm log. 
Requires Read and Write access when logged in. 
Via SMS, this can only be performed by the Main Address 
5.4 
ACT HBT 
Heartbeat Request 
Causes the controller to send a heartbeat immediately after logout. Can be used to synchronize the 
heartbeat transmissions in the Element Manager. 
5.5 
ACT RCD 
This command is used to perform a power cycle of the modem directly after the next logout from the 
repeater is performed. 
Note!
 The controller can also be configured to automatically turn off and turn on the modem once per 
day. This feature can be used to ensure that the modem parameters when using for example GSM 
modems contain the latest network parameters such as HLR update interval etc. 
Attribute MPE is used to configure if automatic modem power cycling should be enabled. 
Timepoint for when to power cycling the modem can be set with attribute MPT. In order to read out Last 
modem Power Cycling timepoint, use attribute LPC. 
5.6 
ACT RHW 
Performs a hardware reset of the active devices ( not including the controller) 
5.7 
ACT RSR 
Resets the controller software, as if the power has been switched off and back on. 
Requires Read and Write access when logged in. 
Via SMS, this can only be performed by the Main Address 
Note 1!
 If logged in, an automatic logout will immediately occur. 
Note 2!
 Since the controller always sends End of Power alarm after power up, two alarms will be sent 
away every time a reset is performed, end of Power 1 and end of Power 2. 
5.8 
ACT TRE 
Test Relay Connection. For installation testing purposes, it is possible to test the open / close function of 
the relay. This test procedure makes sure the relay is closed for 2.5 seconds, then opens for 10 seconds, 
and finally closes for 2.5 seconds before going back to original state. 
Note!
 During this test interval, the relay connection will be unaffected by all alarms. 
5.9 
ACT UPA 
Use Primary Address.