Xsilogy Inc. 0920HP Manual Do Utilizador

Página de 46
Installation 
Hardware Installation Instructions 
3.  Fasten the small, red wire on the BattGuard shunt to the positive 
terminal of the battery. 
 
4.  Connect the ribbon cables on the BattGuard Telesensor to the 
connectors on the BattGuard shunt. 
 
The BattGuard Telesensor begins its initialization process 
automatically. Once initialized, the “CON” indicator will be off, the 
“STA” indicator will be lit until the Telesensor is able to send its data 
to the End-of-String Master, and the “TX,” “LQ,” and “RX” will flash 
briefly during transactions with the Master (every 15 minutes). 
5.  Repeat steps 1 through 4 for all batteries to be monitored. 
 
Preliminary Release X1 
2-5