Boston Scientific Neuromodulation Corporation PSC5210W Manual Do Utilizador

Página de 68
Guidelines for Permanent Implantation
21
Guidelines for Permanent Implantation
This section details the procedures for 
• tunneling the lead/extension as part of an IPG implant, and
• connection of lead/extension to the IPG.
The Tunneling Tool Assembly used in this procedure is provided with 
the Precision device as part of the IPG Kit. 
Percutaneous Lead/Extension Removal
Before revising a trial system for chronic stimulation, the nonsterile 
portion of the lead or extension must be removed. The method chosen 
from the choices below will depend upon how the patient was pre-
pared for the trial phase.
Remove bandages and properly cleanse the exit site.
Option A. Temporary Lead Removal
Remove the lead(s) completely and discard them.
Option B. Extension Removal 
1. Open the midline incision to expose the lead and connector.