ZTE Corporation BS8800C200 Manual Do Utilizador

Página de 167
Chapter 8 Installing Main Antenna Feeder System
5. Carry out performance measurement of antenna and feeder
and make sure the system running normally. Finally seal the
connector with self-adhesive waterproof tape and PVC tape.
E
ND OF STEPS
.
Installing Feeder
Hermetic-window
Context
Installation requirements are described as follows:
The installation position of hermetic window should be close to
a cable tray possibly.
The hermetic window can be mounted against an indoor wall
or outdoor wall and the side of protuberant metal circles must
put towards outdoors
If the feeder enters into a room from a roof, the hermetic win-
dow can be mounted on the roof and the side of protuberant
metal circles must put towards outdoors.
The follow describes the steps of 12 hole hermetic window installed
against the wall.
Steps
1. According to the requirements of engineering design drawing
and the dimension of hermetic window, make sure the instal-
lation position of hermetic window on the wall and at the same
time mark hole positions of expansion bolts and a hollow room
left for the hermetic window.
2. Cut a 250mm×250mm square big hole and then drill eight
holes of expansion blots with a percussive drill, as shown in
Confidential and Proprietary Information of ZTE CORPORATION
125