Murata Machinery Limited Logistics & Automation Division DVM192 Manual Do Utilizador

Página de 35
[USER NAME]
Approval Specifications for [TYPE NAME]  (SRCC-Electrical)                            (33 / 35)
                                             
©Murata Machinery,LTD.Clean Systems Division/ Engineering Dept.
DOC.No.
[DOCUMENT NUMBER]
4.23 SRCC operation procedure
Operation start
(1) Turn the main breaker on.
=>
The Startup screen appears on OPC.
Confirm the message and click the “OK” button.
=>
The Main Monitor screen appears.
=>
The operation panel of MPC is started up and manual operations become
possible.
(2) Start up the local equipment.
(For more information, see the operation procedures for the local equipment.)
- High-frequency power supply
Turn the main breaker on.
=>
The power supply indicator is lit.
Press the standby switch.
=>
The power supply indicator on the MPC operation panel is lit.
- Shunting device
Turn the main breaker on.
Perform a home position recovery operation.
Turn the operation mode to the Automatic mode.
=>
The Automatic mode lamp on the MPC operation panel is lit.
- MPC  operation  panel
Press the high-frequency power supply start switch.
=>
The high-frequency power supply indicator is lit.
=>
The power is supplied to the vehicle and the startup status is
displayed.
(3) Start up the vehicle.
With the remote controller for SRC, perform a home position recovery
operation. After completing the home position recovery operation, select the
Automatic mode and make the vehicle wait for automatic operations.