Planning the Installation
If you have any unresolved issues with the items on this list, contact L-1 Identity Solutions
Technical Support for additional information before beginning any installation.
WARNING
4G Lite devices should be installed by only a qualified
technician. If you are not qualified to perform an
installation task, call L-1 Identity Solutions Technical
Support or contact a qualified installer
.
2.1.1 RECOMENDED STEPS FOR A SUCCESSFUL INSTALLATION
Every installation is unique. Sometimes the issues are well defined and can be handled in a
standard fashion; sometimes the issues are very specific and may not be immediately
recognizable.
L-1 Identity Solutions recommends following these steps for a successful installation:
 Plan the installation - Choose the type of hardware required, decide if a
network is required, and decide on the location and number of required
devices.
 Unpack all items - Unpack all items and check against the packing list.
 Install network hardware components - Install the cabling and
components needed to run the system.
 Install software - Install the software needed to set up the devices.
 Preconfigure device - Connect the device to the USB cable, supply power
to the device, and preconfigure the device.
 Mount devices - Mount the devices in their final locations
 Power distribution and device hook up - Connect the device wiring via
the back panel.
 Power-up procedure - Check the power connections and start the system
safely. Enroll users into the system (for user enrollment procedures).
Chapters 3 through 7 in this document present more information on these steps.