ip.access ltd M180TVX Manual Do Utilizador
© ip.access Ltd
COMPANY CONFIDENTIAL
110#010XA_GDE.doc
- 38 -
Clock Adjustment Problems
No 26MHz clock during Frequency adjustment
Clock adjustment cable not plugged into TIB-OUT
socket on BTS.
socket on BTS.
Unsettled 26MHz during frequency adjustment
Has the BTS been powered up long enough to warm
up? Warm up time is normally less than 60 minutes
but can sometimes take over one hour if the unit has
been stored in a cold environment before power up.
up? Warm up time is normally less than 60 minutes
but can sometimes take over one hour if the unit has
been stored in a cold environment before power up.
Problems During Beacon Test
No signal seen on other nanoBTS during beacon test
The nanoBTS is not enabled to transmit a beacon
The power level of the beacon BTs is set too low.
Select a higher power level.
Select a higher power level.
A white list has been applied which does not include
the beacon channel
the beacon channel
If using the external antenna, ensure that the cable
connections are in place.
connections are in place.