Huawei Technologies Co. Ltd BTS3601C-1900 Manual Do Utilizador

Página de 40
Installation Manual   
iSiteC BTS3601C CDMA Base Station 
Software Installation  & System Commissioning 
Table of Contents 
 
Table of Contents 
1 Overview of Software Installation ......................................................................................1-1
 
1.1 Overview of Software Installation ................................................................................1-1
 
1.1.1 BTS Operational Software ................................................................................1-1
 
1.1.2 Terminal O&M Software ...................................................................................1-2
 
2 Installing BTS Terminal O&M Software..............................................................................2-1
 
2.1 Software Features .....................................................................................................2-1
 
2.2 Installing Local O&M Software ....................................................................................2-1
 
2.2.1 Operational Environment ..................................................................................2-1
 
2.2.2 Conditions .......................................................................................................2-2
 
2.2.3 Network Configuration ......................................................................................2-2
 
2.2.4 Software Installation and Instructions ................................................................2-3
 
2.3 Installing Remote O&M Software ................................................................................2-3
 
2.3.1 Operational Environment ..................................................................................2-3
 
2.3.2 Conditions .......................................................................................................2-3
 
2.3.3 Software Installation and Instructions ................................................................2-3
 
3 Installing BTS Operational Software..................................................................................3-1
 
3.1 Software Media .........................................................................................................3-1
 
3.2 Replacing the Chip ....................................................................................................3-1
 
3.3 Downloading Software ...............................................................................................3-2
 
3.3.1 Methods of Software Loading............................................................................3-2
 
3.3.2 Remote Loading ..............................................................................................3-3
 
3.3.3 Verifying the Software Version ..........................................................................3-7
 
4 System Commissioning.....................................................................................................4-1
 
4.1 Modes of System Commissioning ...............................................................................4-1
 
4.1.1 Local Commissioning .......................................................................................4-1
 
4.1.2 Remote Commissioning....................................................................................4-1
 
4.2 Power-on Operation of Software .................................................................................4-1
 
4.2.1 Board Startup and Indicator Description.............................................................4-2
 
4.2.2 Setting up OML ................................................................................................4-2
 
4.2.3 Setting up Abis Signaling Link ...........................................................................4-3
 
4.2.4 Setting up Cells................................................................................................4-3
 
4.2.5 Normal Operational Status................................................................................4-3
 
4.2.6 Clock Reference Source...................................................................................4-3
 
4.3 Commissioning Board Software ..................................................................................4-4
 
4.3.1 Testing Links ...................................................................................................4-4
 
4.3.2 Processing Faults and Alarms ...........................................................................4-4