Adtran TRC4208 Manual Do Utilizador

Página de 60
Section 4  Network Turnup Procedure
TRACER 4208 System Manual
 36
© 2003 ADTRAN, Inc.
612804208L1-1A
1.
INTRODUCTION
This section discusses the installation process of the TRACER 4208 system.
2.
TOOLS REQUIRED
The tools required for the installation of the TRACER 4208 are:
VT100 terminal or PC with terminal emulation software
RS-232 (DB-25 male for TRACER 4208) cable for connecting to terminal
3.
UNPACK AND INSPECT THE SYSTEM
Each TRACER 4208 is shipped in its own cardboard shipping carton. Open each carton carefully and 
avoid deep penetration into the carton with sharp objects. 
After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in 
transit, immediately file a claim with the carrier, then contact ADTRAN Customer Service (see Customer 
Service, Product Support Information, and Training
 information in the front of this manual).
Contents of ADTRAN Shipment
Your ADTRAN shipment includes the following items:
TRACER 4208 Unit
TRACER 4208 Documentation CD
Eight T1 Crossover (RJ-48 to RJ-48) Cables 
Eight T1 Straight Through (RJ-48 to RJ-48) Cables
Customer Provides
The following items are necessary for the installation of the TRACER 4208 system and are not provided 
by ADTRAN:
21 to 60 VDC power source (or AC adapter available from ADTRAN P/N 1280650L1), either polarity 
referenced to ground
Antenna and mounting hardware
Antenna feedline cable
Lightning arrestors
Weatherproofing kits for antenna installation
Changes or modifications not expressly approved by ADTRAN could void the user’s 
authority to operate the equipment.
To prevent electrical shock, do not install equipment in a wet location or during a lightning 
storm.