Itron Inc. CCU100A Manual Do Utilizador

Página de 132
Grounding Specifications 
 
118 
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 
 
Proprietary and Confidential  
 
The following illustration shows a Principle of Operation. 
 
 
Determining the Correct Measuring Point 
The preferred point of measurement (if internal bonding allows) is on the conductor 
between the ground bus and the service neutral. If internal bonding does not allow access 
to this point, an alternate point is on the service side of the neutral line prior to the neutral 
to ground bond. In either case, it is necessary to ensure there are no neutral-to-ground 
bonds downstream of the measurement point.