Itron Inc. CCU100A Manual Do Utilizador

Página de 132
Chapter 3  Installing the Collector or Repeater 
 
36 
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 
 
Proprietary and Confidential  
 
3.  Press the ferrite bead into the recess in the battery well. 
 
4.  Place the battery in the battery well as shown in the following graphic. 
 
 
Providing Power 
The final step of the collector or repeater installation is to provide power to the 
equipment. Depending on the collector or repeater model, either a two pin cable (DC), 
three pin cable (AC), or a five pin cable (solar) is required. 
 
 
Caution  Do not move or tilt the collector for one minute after connecting power. 
Moving or tilting a collector too soon after connecting power causes the factory 
software and configuration to be loaded. 
 
 
Warning   
Securely mount the collector or repeater before connecting the dedicated AC 
mains power source. 
The collector or repeater must be grounded by either the ground wire in the 
three conductor cable, or the grounding lug on the bottom of the equipment. 
For installations that use the photocell adapter, the grounding lug must be 
used to ground the collector.