ADC Telecommunications Inc. DCX0801B Manual Do Utilizador

Página de 130
ADCP-75-192 
• Issue 1 • December 2005 • Preface 
Page v 
 2005, ADC Telecommunications, Inc. 
TABLE OF CONTENTS 
Content 
Page 
 
7.14  Enabling / Disabling RAN slots.................................................... 3-15 
 7.15 
Forward/Reverse 
Target 
Delay .................................................... 3-16 
 
7.16  FSC Attenuator Offsets ......................................................... 3-16 
 
7.17  Target Simulcast Degree........................................................ 3-16 
 7.18 
Module 
Attenuators ........................................................... 3-16 
  8 
MANAGING THE TENANT OAM ADDRESS AND HOSTNAME TABLES ................................. 3-17 
 8.1 
RAN 
Ordering ............................................................... 3-17 
 
8.2 
Bracketing of Lost RANs ........................................................ 3-18 
 
8.3 
Clearing of RANs ............................................................. 3-18 
  9 
HUB NODE ACCESS/MANAGEMENT ...................................................... 3-18 
 
9.1 
Managing Hub Nodes .......................................................... 3-18 
 
9.2 
Identification using the Network IP Receiver/Sender ..................................... 3-18 
 
9.3 
Accessing Nodes Locally........................................................ 3-19 
 
9.4 
Accessing Nodes via TCP/IP ..................................................... 3-19 
 
9.5 
Using a Third Party Network Management System with Digivance CXD ......................... 3-20 
  10 
CONFIGURING THE HUBMASTER NODE.................................................... 3-20 
 
10.1 
Utilizing The Configure-Hubmaster Script ............................................ 3-21 
 
10.2 
Using Dynamic Host Configuration Protocol with Digivance CXD ............................. 3-22 
  11 
CONFIGURING THE HUB “SLAVE” AND RAN NODES ........................................... 3-24 
 
11.1 
Managing The Hub Node MIB..................................................... 3-24 
 
11.2 
Managing the RAN Node MIB..................................................... 3-26 
SECTION 4 
BTS INTEGRATION 
 1  BTS 
VALIDATION ................................................................... 4-1 
 2  PATH 
BALANCING ................................................................... 4-1 
 
2.1 
Forward Path Balancing ......................................................... 4-2 
 
2.2 
Reverse Path Balancing ......................................................... 4-4 
 
2.5 
Functional RAN Call Verification ................................................... 4-5 
SECTION 5 
SOFTWARE UPDATES 
 1  SOFTWARE 
RELEASE 
DELIVERABLE ....................................................... 5-1 
 2  RELEASE 
NOTES .................................................................... 5-1 
 3  UPGRADING 
EXISTING 
SYSTEM.......................................................... 5-2 
 3.1 
Preliminary 
Steps ............................................................. 5-2 
 3.2 
Upgrade 
Steps ............................................................... 5-2 
 4  VERIFICATION ..................................................................... 5-3 
 5  FAILED 
UPGRADES .................................................................. 5-4 
 6  FPGA 
UPDATES .................................................................... 5-5 
 7  BACKUP/RESTORE .................................................................. 5-5 
 7.1 
Backup .................................................................... 5-5