Rothenbuhler Engineering Company Inc 1673-1 Manual Do Utilizador
1673 OPERATION MANUAL REV A
30
4. RFD OPERATIONAL PROCEDURES
4.1.
SETTING UP THE RFD
4.1.1.
Select the number of Remotes required for the operation. Ensure all units are
sufficiently charged and tested according to Chapter 3.
Figure 4-1 Raising the Controller Antenna
4.1.2.
Ensure the Controller Unit electronic key is removed. Position the Controller Unit at the
intended firing position and raise the antenna vertically.
4.1.3.
Select a position for the first Remote Unit close to the blast area, but far enough to
ensure the Remote is safe from direct air blasts and falling rocks.