SANYO Electric Co. Ltd. PBS-CS47 Manual Do Utilizador

Página de 18
11
Connection of the Line cable (1)
1) Reeve the cable from the dome nut into
the lid.
2) Pull the line cable out to enough length
that the tip of the cable can be
processed.
3) Peeling of the line cable covering.
     (Photo 6)
\
Peel off the covering of the line cable. The
length of the line cable is 100 - 120 mm.
(Photo 6)
4) Loosen the shield and wind it on the
heart line of covering 4 turns or more.
(Photo 7)
\
Loosen these four pair lines, plug in the
designated touching sockets.
(photo6)
(photo7)
Shield tape
Drain wire
Covering
100 - 120mm
Wind the aluminum shield, and
furthermore wind drain wire here too.
Process the end of the line wire, which are
not used, with the suiting tape.