Intergas Combi Compact HRE 28/24 8718556042338 Manual Do Utilizador

Códigos do produto
8718556042338
Página de 14
Flue positioning    25
Flue positioning    24
Vertical & horizontal flue terminal positioning
For further information 
about minimum flue terminal
postioning distances, please
refer to the installation,
service and user instructions.
Flue system
All Intergas boilers utilise a concrentric flue
arrangement consisting of a 60mm diameter
inner flue and a 100mm diameter outer air inlet
duct and are available in both vertical and
horizontal arrangements. 
Horizontal flue system
The 60/100mm horizontal flue system may be
extended to a maximum of length of 10 metres
however, for every 45° bend used, the flue length
should be reduced by 1 metre. For every 90°
bend used, the flue length should be reduced 
by 1.5 metres.
Vertical flue system
A vertical 60/100mm flue system is also available,
which can be extended to a maximum of length
of 10 metres. Again, this distance should be
reduced if using 45° and 90° bends similar to 
the horizontal system. 
Plume Management Kit
To avoid plume vapour re-entering the boiler via
the air intake, a Plume Management Kit (PMK)
must be fitted.
The diagram opposite illustrates many 
typical flueing options, including parts required.
These are for illustration purposes only. 
Please consult your installer or Intergas 
stockist for more bespoke installations. 
Telescopic 
Horizontal Flue 
Assembly
Parts required:
081281
Standard Vertical Flue Assembly
Parts required:
086842 & 087372
Horizontal
1000mm & 
Vertical Flue 
Assembly
Parts required:
082975,
084660, 086842
& 087372
Horizontal
1000mm Flue 
Assembly 
with Plume
Management Kit
Parts required:
081288 &
082974
Flue Option 2
Vertical Flue 
Assembly
Parts required:
087910, 086842
& 082975 
(extentions as 
required)
Vertical Flue 
Assembly with
obstruction
Parts required:
087910, 086842,
084661 x2
& 082975 
(extentions as 
required)
Horizontal Flue 
Assembly
Parts required:
081288 &
082975 
(extentions as 
required)
50mm fall
100mm fall
150mm fall
1000mm
1000mm
1000mm
All horizontal flues must be installed with a 3° fall back towards the
boiler. For example, for every 1000mm of flue, there should be a 
fall of 50mm and must be supported by a minimum of 1 bracket 
per 1000mm, ideally positioned just before the joint.
NB. All the flue joints should be accessible for inspection via a 
flue inspection hatch.  
All flue systems must be installed and terminated
in accordance with BS 5440 Part 1
Flue Option 1
Flue Option 3
Flue Option 4
Flue Option 6
Flue Option 8
Flue Option 7
Horizontal Offset Flue Assembly
Parts required:
081280 (Retro fit)
Flue Option 5