HP Performance Optimized Data Center (POD) 40c Guia De Configuração Rápida

Página de 41
 
Site requirements  12 
 
Grounding feature 
Specification 
Grounding electrode 
conductor pad 
 
The grounding electrode conductor connection bus pad is located on the outside of 
the HP POD 40c G2 on the cold aisle adjacent to the power cabinet. 
 
The grounding pad must be connected to the grounding electrode system or 
building steel in accordance with Article 250 of the NEC or equivalent regional 
regulation. 
Grounding lugs 
 
Grounding lugs cannot be attached to any painted surface. 
 
Grounding lugs must be compression-type 2-hole lugs and UL listed specifically for 
grounding. 
Ground rod system or 
ground well 
The customer must provide an effective grounding system with a ground rod or a 
ground well. 
 
  
 
IMPORTANT:
  Before installing the HP POD 40c G2, consult your local AHJ for applicable codes 
and to review site-specific location guidelines. If needed, obtain any necessary permits. 
  
The following figure shows the grounding electrode conductor connection that is located on the cold aisle of 
the HP POD 40c G2. 
Side view shown 
 
 
Utilities 
Consider the proximity to required utilities, such as power, water, and network connections. While the 
required utilities can be brought to nearly any selected site, there is the potential for increased costs and 
decreased efficiency when the HP POD 40c G2 is located farther from the utility sources. 
For utility clearance information, see "Dimensions and clearances (on page 
)." 
 
Humidifier water supply 
The HP POD 40c G2 requires supply water for the humidifier. The supply water must meet the following 
requirements. 
 
Requirement   
Specification 
Pressure 
Between 20 and 110 psi, 0.1 and 0.8 MPa 
Temperature 
Between 1º and 40°C (33º and 104°F) 
Minimum flow rate 
1.45 lpm (0.12 gpm)