HP Performance Optimized Data Center (POD) 20cp Guia De Referência

Página de 37
 
Index  37 
site planning considerations   22 
site preparation   6 
site preparation checklist   28 
site requirements   8, 21 
storage locations   23 
supported facility connections   16 
system capacity   7 
U 
utilities   12 
V 
vestibule specifications   24 
W 
warranty information   32 
water supply   12, 13 
weight   8 
Z 
zoning and permit requirements   21