Arboria Arbor Base Folheto

Página de 2
Division of LWO Corp. / P.O. Box 17125 / 3841 North Columbia Boulevard / Portland, Oregon
503-286-5372 / fax 1-503-286-4092 /  www.arboria.com         
2 of 2
    
820.3163 
    
Arbor Base 
updated 
09/09/2005
STEP 2B
STEP 3
Place  large planters (minimum of 40 lbs. per side 
recommended) on both sides of the arbor.  This 
will help to keep the arbor secure and plumb.
A
Attach braces to the outside of arbor base assembly, 
then to arbor frame.