Vortech Engineering Nissan 350Z/Infinity G35Supercharger System 2003-2006 Manual Do Utilizador

Página de 28
P/N: 4NZ020-010
©2007 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
12JAN07 v4.0 Nissan 350Z(4NZv4.0)
14
A.
Remove the inspection cover over the battery.
Remove the plastic clips securing the larger
cover over the battery and remove it as well.
B.
Using the supplied adhesive backed Velcro,
position the ignition timing control computer
next to the battery as shown. (See Fig. 10-a.)
C.
Run the wires through the firewall grommet
next to the main ECU wiring harness.
D.
The ECU is located behind the passenger’s
side kick panel. Remove the door scuff panel
and the kick panel.
E.
Remove the ECU harness connector by
pulling on the lever. Remove the plastic cover
from the connector so that the wires can be
traced to their respective terminals. (See Fig.
10-b.)
10.
2003-2005 STANDARD ENGINE TIMING CONTROLLER INSTALLATION (For 2005
“Rev-Up” and 2006 Vehicles Skip to Section 11)
Fig. 10-a
NOTE:
Always verify each pin location. Wire
color is provided as a reference only. If
there is a discrepancy between wire
color and pin location, disregard wire
color and use the numbered pin location.
Fig. 10-b
F.
See Fig. 10-c for the ECU harness connector
terminal layout as viewed from the side of the
connector where the wires are inserted.
G.
Connect the thin 20Ga RED wire to battery
positive switched by the ignition (ECU har-
ness connector terminal 109
). Use the sup-
plied T-Tap and spade connector.
H.
Connect the BLACK wire to the ECU ground
(Terminal 115). Use the supplied T-Tap and
spade connector.
I.
Locateand cut the MAF sensor signal wire
(Terminal 51).
NOTE:
Soldered wire connections are more
sound than crimp-on connectors
because they can be inspected. It is up
to the installer to guarantee good con-
nections. If there is any doubt, or the
vehicle performs erratically, solder and
insulate each connection.