Pfaff Water Heater 581 583 Manual Do Utilizador

Página de 40
 
25
 
 
Preparation 
Fig. 9 - 01
9 Preparation 
All regulations and instructions in this Instruction Manual are to be observed! 
Special attention is to be paid to the safety regulations!
All preparation work is only to be carried out by appropriately trained personnel. 
Before all preparation work, the machine is to be separated from the electricity 
supply by removing the plug from the mains or switching off the On/Off switch!
9
.01 
Inserting the needle
Switch off the machine!
Danger of injury due to uninten-
tional starting of the machine!
Only use needles from the sy-
stem intended for the machine, 
see Chapter 3 Specifi cations.
 
● Raise needle bar.
 
● Loosen screw 1 and insert needle 2 until 
you feel it stop. 
 
● The long needle groove must be aligned 
in the direction of the machine head.
 
● Tighten screw 1.
1
2