Table 20: Site Preparation Checklist for the SRX210 Services Gateway
Installation (continued)
Installation (continued)
Date
and
Notes
and
Notes
Additional Information
Item or Task
■
Measure distance between external power
sources and device installation site.
sources and device installation site.
■
Locate sites for connection of system
grounding.
grounding.
■
Calculate the power consumption and
requirements.
requirements.
Rack Installation
■
Verify that your rack meets the minimum
requirements.
requirements.
■
Plan rack location, including required space
clearances.
clearances.
■
Secure the rack to the floor and building
structure.
structure.
Cabinet Installation
■
Verify that your cabinet meets the
minimum requirements.
minimum requirements.
■
Plan the cabinet location, including required
space clearances.
space clearances.
Wall Installation
■
Verify that the area selected meets the
minimum requirements.
minimum requirements.
■
Verify that you have the required hardware
to proceed with the installation.
to proceed with the installation.
Desktop Installation
■
Verify that the area selected meets the
minimum requirements.
minimum requirements.
■
Plan the installation location, including
required space clearances and airflow
requirements.
required space clearances and airflow
requirements.
Cables
■
Acquire cables and connectors.
■
Review the maximum distance allowed for
each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
■
Plan the cable routing and management.
Related Topics
■
■
50
■
Site Preparation Checklist for the SRX210 Services Gateway