Infortrend EONSTOR A16E-G2130-4 Manual Do Utilizador

Página de 98
Chapter 2 
Hardware Installation  
 
 
2.1 Introduction 
This chapter gives detailed instructions on how to install the subsystem. 
When installing the subsystem, it is necessary to mount the chassis into a 
rack cabinet and to install hard drives and drive trays. Installation into a rack 
or cabinet should occur before the hard drives or drive trays are installed 
into the subsystem. Please confirm that you received all of the components 
listed on the Unpacking List that came with the subsystem before 
proceeding with the installation process. 
 CAUTION! 
Please note that the installation instructions described in this manual 
should be carefully followed to prevent any difficulties and damages to 
your subsystem. 
 
2.2 Installation Prerequisites 
1.  Static-free installation environment: The EonStor A16E-G2130-4 
subsystem must be installed in a static-free environment to minimize 
the possibility of electrostatic discharge (ESD) damage. (See Section 
2.  Component check: Before installing the EonStor A16E-G2130-4 
subsystem, you should first check to see that you have received all the 
required components. (See Section 2.5) If any items appear damaged, 
contact your vendor for a replacement. 
3.  Hard drives: Up to sixteen (16) SATA-I or SATA-II hard drives must 
be purchased separately prior to installing the subsystem. (See Section 
 
4.  Cabling: The EonStor A16E-G2130-4 models all come with one (1) 
audio-jack-to-DB9 cable to facilitate the connection of the COM1 serial 
port of a management computer for terminal emulation management. 
Two (2) power cords are provided for the power connections to the 
power sources. For the compliance with listed emission standard, RJ-45 
Introduction 
2-1