Chapter 4: Subsystem Connection and Operation 
The servers or iSCSI initiators should be the last devices that are turned 
on. Please refer to the documentation that came with your application 
servers to see their own power on procedures. 
4.3.3  Power On Enclosure  
To power on the subsystem, turn on the two power switches located on the rear panel of 
that both switches are turned on.  There is no limitation on which PSU should be powered 
on first.  
 
Figure 4-3: Power Switches 
 
 
 CAUTION! 
Although the PSUs are redundant and a single PSU can provide sufficient power to 
the subsystem, it is advisable to turn both of the power switches on. If only one PSU is 
operating and fails, system operation will be terminated. 
 
4.3.4  Power On Status Check 
Once the subsystem has been powered on, the status of the entire subsystem should be 
checked to ensure that everything is running smoothly and that there are no complications 
or malfunctions. 
 
Controller Module LEDs – The controller ready LED should flash green. 
 
Drive Tray LEDs – The drive status LEDs (that contain hard drives) should all 
lights blue.  
 
Firmware and RAIDWatch – The overall status of the system may be checked 
using the embedded firmware utility or the RAIDWatch GUI screen. 
Power On 
 