Power, electrical, and controls  25 
Power, electrical, and controls 
Site electrical system 
To be sure that the POD solution is completely and safely integrated with your facility, HP requires that you 
complete the following actions for the installed electrical system prior to the installation of the HP POD 
solution: 
 
Short circuit analysis 
 
Arc flash study 
 
Circuit breaker coordination study 
These actions must be performed for all associated parts of the electrical power train. The majority of the 
details and factors that are required to complete these studies are associated with the existing installed 
facility infrastructure. 
  
 
CAUTION: 
 Failure to complete these studies can cause serious issues with the electrical 
integration of the POD into your electrical system. 
  
 
Power safety 
  
 
WARNING:
  To avoid the risk of personal injury or loss of life, all personnel must comply with PPE 
requirements when opening or working inside areas of the HP POD 240e NA that are marked as 
hazardous voltage, per NFPA 70E in accordance with NEC (NA) and IEC (EMEA and APJ). 
  
 
Grounding and bonding 
  
 
WARNING:
  To avoid the risk of personal injury or electric shock, the HP POD 240e NA must be 
properly earthed (grounded), and each of the individual sections must be bonded together per 
NFPA 70 in accordance with NEC (NA) and IEC (EMEA and APJ). 
  
The HP POD 240e NA must be properly earthed to be sure that a common return path for electric current 
exists, limit the build-up of static electricity, and absorb an unlimited amount of current without changing its 
potential. To properly ground the HP POD 240e NA to the earth, you must connect the POD to building steel, 
a ground rod, or a properly installed ground well that is connected to a building’s grounding system. The 
grounding electrode conductor connection point is located on the cold aisle side adjacent to the power 
cabinet. 
A certified electrician must test and verify the HP POD 240e NA is properly grounded. 
 
Grounding 
The HP POD 240e NA includes the following types of grounding. 
Earth ground