HP Performance Optimized Data Center (POD) 40cp Manual Do Serviço

Página de 79
 
Periodic maintenance  64 
2. 
Power down the IT equipment in the zone where the leak is located. 
3. 
Determine the affected heat exchanger. 
4. 
Close and danger tag the supply and return valves to the affected heat exchanger. 
If the heat affected exchanger cannot be identified, close all the heat exchanger supply and return 
valves in the affected zone and open one supply valve at a time to determine the location of the leak. 
5. 
Repair the leak or contact HP if you are still within your service contract. 
 
Humidifier (if installed) 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Humidifier 
 
Inspect for water leaks, verify 
that no sparks form between 
the electrodes during 
operation 
 
Inspect the general operation 
of the cylinder. 
 
Every 2 
weeks, if 
staffed 
 
Quarterly, if 
not staffed 
Qualified personnel 
Humidifier drains 
Verify the following: 
 
Drains are in working order 
 
There is an air gap at the 
funnel/drain entry into the site 
system 
 
Drain discharge is not getting 
water on external equipment 
or grounding system 
Quarterly 
Qualified personnel 
— 
Put the humidifier in system flush 
mode and inspect drain flow and 
water supply flow. Inspect, clean, 
and/or replace as necessary. 
Quarterly 
Qualified personnel 
— 
Inspect for any internal or external 
water leaks, repair or replace 
leaking components. 
Quarterly 
Qualified personnel 
— 
Using LLS, verify proper cylinder 
operation. Inspect the cylinder for 
blackened areas and, if present, 
check the condition of the 
electrodes. If necessary, replace 
the cylinder. 
Quarterly 
Qualified personnel 
— 
Replace the cylinder. 
Annually 
Qualified personnel 
 
 
ECS 
 
Component to be inspected 
Task 
Frequency 
Capable party 
Full system functional check 
Check the operation of all system 
components. 
Quarterly 
Qualified personnel 
— 
Check and clear the alarm log. 
Quarterly 
Qualified personnel 
— 
Inspect and test the ECS battery 
backup system. 
Every 2 years 
Qualified personnel