Adams Building Set AQT SERIES Manual Do Utilizador

Página de 16
5.0 PREPARATION 
5.1  SETTING UP THE BALANCE 
 
CAUTION 
•  Avoid installing the balance in direct sunlight that may cause poor 
performance or malfunctions.  
•  Place the balance on a firm weighing table so that the balance is 
levelled. The balance will not perform accurately when it is not 
levelled. 
•  Level by adjusting the feet to centre the bubble in the spirit level. 
•  Remove the shipping protection screw and round cover as shown 
below using the Allen key supplied in the box. (It is advisable to keep 
the shipping protection screw and the round cover along with the 
packing box for using during shipping to another location in future). 
 
 
 
Shipping protection screw 
 
Round cover around the screw 
 
 
 
 
•  Place the platform (comes separately packed) in the receptacles on 
the top cover. Place the stainless steel pan. (See the diagram on 
page 5). 
•  Do not press with excessive force as it could damage the load cell 
inside. 
•  Place the balance on a firm and flat surface for accurate weighing. 
5.2  INSTALLING BATTERIES AND POWER         
 
Remove the battery compartment cover and insert six batteries (R6P/LR6 
/AA size) into the battery compartment. Take extreme care in placing the 
positive and negative polarities correctly.  
 
Alternately, plug in the AC adapter into the socket at the rear of the 
balance. The AC input requirement could be 100, 120, 220, 230 or 240 
Volts (50/60Hz) depending on the location where it is used. Verify the 
adapter is correct. 
 
© Adam Equipment Company 2006