GOLD CGs Gas-Fired Water Boiler — Boiler Manual
Prepare boiler location — clearances
1b
Figure 2 
Required MINIMUM clearances
Figure 1
Recommended 
SERVICE
 clearances 
 
(see 
WARNING 
below)
Recommended SERVICE clearances
(Fig. 1)
1.  Provide clearances for cleaning and servicing the boiler and for
access to controls and components. See Figure 1 for recommenda-
tions.
.  Provide at least screwdriver clearance to jacket front panel screws
for removal of front panel for inspection and minor service. If
unable to provide at least screwdriver clearance, install unions and
shutoff valves in system so boiler can be moved for servicing.
Required MINIMUM clearances
(Fig. 2)
Never install the boiler in a space with clear-
ances less than the minimum clearances shown 
in Figure 2
. Failure to comply can result in severe
personal  injury,  death  or  substantial  property
damage and reduced boiler life.
1.
Hot water pipes: 
at least ¹⁄₂ inch
from combustible material.
.
Single-wall vent pipe: 
at least 6 inches
from combustible mate-
rial.
3.
Type B double-wall metal vent pipe
: refer to vent manufacturer’s
recommendation for clearances to combustible material.
If any clearance is less than in Figure 
1, provide 
openings  for  combustion  and  ventilation  air 
located on the wall or door opposite the boiler 
FRONT (see Figure 2)
.
 
These openings must be located as shown in Figure  to provide
proper air flow around the boiler. The free area of each opening
(after deducting for louvers) must be at least
one square inch per 
1,000  Btuh
 of  boiler  input.  If  the  building  is  of  unusually  tight
construction (see page 10 for definition), the air openings must
connect directly to outside or the building must have air openings
to the outside as specified on page 10.
If  clearances  are  equal  to  or  greater  than  Figure 1,  see  pages 10
and 11 for location and sizing of combustion air openings.
Failure  to  comply  can  result  in  severe  personal  injury,  death  or
substantial property damage and reduced boiler life.
Flooring
The CGi boiler is approved for installation on combustible
flooring, but must never be installed on carpeting.
Do not install boiler on carpeting even
if  foundation  is  used.  Fire  can  result,
causing  severe  personal  injury,  death
or substantial property damage.
Foundation
1.  Provide a solid brick or minimum -inch thick concrete
foundation pad if any of the following is true:
•  floor can become flooded.
•  the boiler mounting area is not level.
.  Minimum dimensions are
25” length
by:
Minimum foundation width
CGs-3
15”
CGs-5
21”
CGs-4
18”
CGs-6
24”
Residential garage installations
Take the following special precautions when installing the
boiler in a residential garage. If the boiler is located in a
residential garage, per ANSI Z3.1:
•  Mount the boiler a minimum of
18 inches above the 
floor
of the garage to assure the burner and ignition
devices will be no less than 18 inches above the floor.
•  Locate or
protect the boiler
so it cannot be damaged
by a moving vehicle.