Raritan Computer Paragon II 255-30-6000-00 Manual Do Utilizador
Installing a Cascaded Paragon System
36
a. Connect one end of a stacking cable to ʺExpansion Port Out Aʺ on
the back of the Stacking Unit. Connect the other end of the cable
to the lower ʺExpansion Port Inʺ on the Main Unit.
to the lower ʺExpansion Port Inʺ on the Main Unit.
b. Connect one end of the other stacking cable to “Expansion Port
Out B” on the back of the other Stacking Unit. Connect the other
end of the cable to the upper “Expansion Port In” on the Main
Unit.
end of the cable to the upper “Expansion Port In” on the Main
Unit.
4. Power ON all Paragon switches.
5. On the front panel of the Main Unit:
a. Press the FUNC button and use the and buttons to select
ʺStacking Support.ʺ Press the ENT button to confirm the
selection.
selection.
b. Set the total number of Stacking Units (1 unit maximum) and
press the ENT button to save the setting.
6. On the front panel of the Stacking Unit:
a. Press the FUNC button and use the and buttons to select
ʺSet Stack ID.ʺ Press the ENT button to confirm the selection.
b. Assign the Stacking Unit ID using the and buttons.
7. Press the ENT button to save the setting.
8. Power OFF all Paragon switches.
9. Power on the Stacking Unit.
10. Power on the Main Unit.
Important Note about Powering Off the Stacking Unit
Never power off a Stacking Unit when it is still CONNECTED to a
Main Unit. Doing so will cause the channel color display on the OSUI
Selection Menu to become incorrect. To power off the Stacking Unit, you
must disconnect it from the Main Unit first.
Main Unit. Doing so will cause the channel color display on the OSUI
Selection Menu to become incorrect. To power off the Stacking Unit, you
must disconnect it from the Main Unit first.
If the Stacking Unit is powered off by accident when it is still connected to
the Main Unit, do the following to restore the color display to normal:
the Main Unit, do the following to restore the color display to normal:
1. Remove the stacking cable connected between Stacking and Main
Units.
2. Power off the Main Unit.
3. Connect the stacking cable between Main and Stacking Units.
4. Power on the Stacking Unit first.
5. Then power on the Main Unit.